The
processes of Making Cabinets
|
Unit
|
Outcome
|
What
you are required to do
|
|
029
|
1
|
Preparation
of drawings, sketches etc. extract information to produce
cutting lists and written specification
|
Produce a design
brief including sketches Specification,
Scale drawing,
Cutting List.
|
|
|
2
|
Identify,
select, prepare and maintain tools, equipment and work area to
carry out the processes
|
Select tools, etc.
for the immediate process.
Check that you have
tools, cutter shapes, etc. suitable for the job.
Sharpen tools as
necessary.
Ensure work area is
prepared for the tasks at hand.
Put tools away that are no longer needed.
|
|
|
3
|
Produce
patterns, templates, jigs, workshop tools and devices
|
Manufacture any
pattern, jig or template required for shapes, joints or holding.
|
|
|
4
|
Identify,
select materials, timber, board, etc to be used
|
Select the timber and
board material that you are going to use.
Consider thickness, colour, strength property, tangential
or radial boards,
Placing of
defects/knots, etc. durability, grain, features, costs, etc.
Identify face and
edges – apply marks.
|
|
|
5
|
Cut
out components to given dimensions using machinery safely
|
Surface and thickness
timber to specification.
Cut to overall
lengths.
|
|
030
|
1
|
Use
tools and equipment to perform practical tasks
|
Rehearse processes if
necessary.
|
|
|
2
|
Cut
out joints
|
Cut out joints.
Test for fit.
Adjust and refit.
|
|
|
3
|
Shape
components.
Veneer surfaces.
|
Shape any components
using appropriate methods by sawing, planing, moulding,
fabricating, steaming, etc.
Veneer using, hammer,
cauls, press.
|
|
|
4
|
Construct
cabinets, tables, etc.
|
Select appropriate
construction method:
Cabinet or Box
construction,
Frame,
Table or stool,
Drawer.
|
|
|
5
|
Assemble
cabinets, tables, etc.
|
Trial assemble, check
dimensions, square, wind and fitting.
Apply appropriate
adhesive,
Assemble and clamp.
Check accuracy and
adjust as necessary,
|
|
031
|
1
|
Fit
doors, drawers and hardware, etc.
|
Drawer construction,
i.e. lap and common dovetails.
Flush, surface and mechanical.
Door construction,
i.e. frame or solid.
Flush or surface
fitted.
Pre fit ironmongery,
check and remove for finishing.
Fit ironmongery after
all appropriate finishes have been applied.
|
|
|
2
|
Apply
carved mouldings
|
Apply mouldings using
glue and pins, etc.
|
|
|
3
|
Make
necessary repairs and adjustments
|
Check, repair, adjust
as necessary.
|